Procurement-ready
Quote structure includes spec, packaging, Incoterms, lead time, and documentation scope.
Product Construction Chemicals
Sulfonated melamine formaldehyde (SMF) high-range water reducer for concrete and cementitious mixes — improved dispersion, enhanced workability, and lower water demand for strength and durability performance.
Quote structure includes spec, packaging, Incoterms, lead time, and documentation scope.
COA alignment and sampling options available for recurring lanes.
Share cement type, w/c target, slump window, and temperature — we’ll align the grade.
SMF (sulfonated melamine formaldehyde) is a high-range water reducing admixture (HRWR) used to disperse cement particles, reduce water demand, and improve workability without sacrificing early strength development. It is commonly selected where a clean finish, reliable dispersion, and stable performance are required.
Improved slump/workability at a given water content, or reduced water at a constant slump target — supporting higher strength and tighter permeability.
Ready-mix, precast, grouts, mortar systems, and cementitious blends where higher flow and reduced w/c ratio are targeted.
We quote by grade and packaging with export terms. Include destination and monthly volume for best landed cost.
Performance depends on cement chemistry, fines content, temperature, mixing energy, and other admixtures. Provide your mix parameters for alignment.
SMF is typically used as a dispersing agent in cementitious systems to improve particle dispersion and flow. Selection and dosage should be validated in your mix design under site temperature and aggregate conditions.
Compatibility depends on cement composition (C3A/C3S balance, alkalis, sulfate form), SCMs, water quality, and the full admixture package. Always run lab trials and field validation.
Typical values depend on grade and manufacturer. We confirm on quotation and provide COA ranges (where available).
Light yellow to brown flakes/powder (grade dependent)
By grade (confirm on offer & COA)
Water soluble (verify dissolution protocol for your process)
Typically controlled for construction use (confirm limit on offer)
Typical range by grade (confirm on offer)
Bags / supersacks (standard). Palletization and export wrap available.
SDS • TDS • COA (batch-specific). Additional documents may include origin statements and packing list details as required.
Store sealed in a dry, cool area away from moisture. Typical shelf life depends on packaging and humidity control (confirm on offer).
Use appropriate PPE and dust control during handling. Refer to SDS for safe handling and transport classification details.
Specifications may vary by batch, origin, and packaging selection. For regulated projects, share your target standard and acceptance criteria in the RFQ.
We structure supply to reduce procurement friction: clear spec alignment, predictable packaging, and export-ready documentation. Tell us your destination and consumption cadence so we can propose the best lane (direct container, consolidated export, or local distribution where available).
Standard bags and supersacks. Palletized shipments and moisture-barrier wrap available for humid routes.
Quotation can be provided on EXW/FOB/CFR/CIF (as applicable). We’ll optimize for landed cost and lead time.
COA per batch. Sampling/retention approaches available for recurring purchases by agreement.
We support qualification and procurement workflows with the documents you need for technical review. If your project references a specific standard, include it in your inquiry so we can align the correct grade and supplier lane.
SDS • TDS • COA (batch specific)
Packing list, commercial invoice, and other routine export documents (lane dependent)
Sampling pathways and typical ranges (where available) for your lab evaluation plan
Note: any project-specific compliance or certification requirements must be confirmed in writing during quotation and contracting.
Send your requirements and we’ll return a quotation with spec alignment, packaging, lead time, and documentation scope. For faster turnaround, include destination and estimated monthly volume.
Grade • packaging • Incoterms • lead time • document pack • validity window
We route inquiries by lane (construction chemicals) to match supplier and logistics constraints.
Ask for sample pathway and typical ranges; we’ll align to your evaluation plan.
Prefer using the main inquiry form to ensure correct routing. You can also use the contact modal button at the bottom right.